Detecto EB-60-215 Manual do Utilizador Página 13

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 20
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 12
13
D 215 - RTR 684 C2 Eng. 14.06.00
We reserve the right to make changes without notice
COSTER
17. COMMISSIONING PLANT
Testing to be carried out at conclusion of installation and when wiring and configuration completed
and tested.
17.
1 Testing C-Ring
The C-Ring testing page appears only if it has been configured in
Ensure that all the other controllers wired in C-Ring are :
– correctly powered by 230 V ~
– Slave controllers or configured as SECONDARIES in
– selected on testing page
The PRIMARY controller sends via C-Ring a signal every five seconds : on all the displays appears
“??”. If the wiring is correct the word “YES” replaces “??” on all the displays. If on one or more
displays “YES” does not appear, this means that there is a wiring or controller fault betwen the last
controller displaying “YES” and the first displaying “??”.
Examples of testing a C-Ring with four controllers :
– Cont1 "YES" – Cont2 "YES" – Cont3 "YES" – Cont4 "YES" :
C-Ring OK
– Cont1 "??" – Cont2 "YES" – Cont3 "YES" – Cont4 "YES" :
C-Ring faultly between 4 and 1
– Cont1 "??" – Cont2 "YES" – Cont3 "??" – Cont4 "??" :
C-Ring faultly between 2 and 3
– Cont1 "??" – Cont2 "??" – Cont3 "??" – Cont4 "??" :
C-Ring faultly between 1 and 2
17.2 Testing outputs
Using + and - keys select :
• output to be tested :
VALVE
;
PUMP
;
AUXILIARY
;
• status :
– with VALVE :
IDLE
;
CLOSES
;
OPENS
– PUMP & AUXILIARIES :
ON
;
OFF
.
Check the results.
25.1
CR i ng : ??
CRing connection
PR I MARY
24.2
CRing connect ion
SECONDARY
CRing connection
SECONDARY
CRi ng : ??
25.2
Ou t pu t : VALVE
Status: IDLE
Vista de página 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 19 20

Comentários a estes Manuais

Sem comentários